Saturday, February 4, 2012

Basement: Weeks 1 and 2

We've gotten to know the guy who is working on our foundation quite well after two weeks of having him at the house everyday. The kids are used to him and call him by name and I will admit that I've enjoyed having another adult in the house to talk to from time to time. I have been very impressed with his work habits, his quality of work once done, and how well he has respected our house and family. He is a great person to hire, so if you need foundation work done call Raymond Marsee and Sons. It was once a large business, but Chris, the guy who owns the company name has downsized to just himself. He does all of the work on his own and listens to what his customers want. He has bent over backwards trying to make our egress window what we've pictured, he cut part of our wall out (in exchange for the panels we are removing), and he installed a hopper window that wasn't in his contract. He is a great guy and I'm thrilled that we hired him to do our work for us!

At the end of week one we had an (almost) finished floor drain that runs to the sump pump in case we happen to get water in the walls (we shouldn't) and we had one full wall of beams installed. This week we have a totally complete floor drain, all of our beams are in and painted, all of the cracks have been filled, our section of wall at the base of the steps has been reinforced and removed, our hopper window has been replaced, a huge hole has been dug outside, and we have a hole cut in our wall where the egress window will be. By Wednesday we will (hopefully) have the window finished other than installation and all of the remaining panels will be removed. We are getting close to the next phase!

No comments:

Post a Comment